Skip to content

LETTER TO THE EDITOR: New 972 Main St. design is better

Table of Contents

To the Editor:

To my eye, the revised design for 972 Main St. is an improvement on the previous — approved — one.

It appears now to be made of a single material (one hopes all in a single color,) and with a much more unified massing of parts. The earlier design looks like parts of several other structures, in a variety of textures and colors, as if assembled from a sale on floor samples. (The intent may have been to appear like a series of row-houses.)

I also find the indented balconies an improvement over the added-on ones. I see better windows and better treatment of the ground floor.

It looks to me like the refinements are a step in the right direction.

John McConnell, architect

Letters to the editor and opinion columns are welcome by emailing editor@winchesternews.org. Click here for the Winchester News policies for submission.

Latest

Winchester High laxmen advance to the D-1 Elite 8 game against host St. John’s Prep today (June 6) at 2 p.m.

Winchester High laxmen advance to the D-1 Elite 8 game against host St. John’s Prep today (June 6) at 2 p.m.

The Winchester High boys lacrosse team (18-2), the seventh seed in Division 1, has outscored its first two state tournament opponents – Bridgewater-Raynham (13-2, 26th seed, 12-7 final record, counting playoffs) and St. John’s of Shrewsbury (15-14 in OT, 10th seed, 11-9 final record, counting playoffs) – by a combined score

  Subscribe