Improvement plans continue for Cross and Forest streets
The results of a study on Cross Street at Forest Street were met with some consternation from residents during a recent public hearing. Toole Engineer Erica Guidoboni said the study looked at a stretch of roadway from the Tri-Community Greenway crossing to Marion Street and the scope of the study